Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

All ideas

Remove 6 inch limitations in STAAD Foundation Advanced 2026

There is a maximum limit 6" for pile embedment and also for bottom steel reinforcing in mat foundations in SFA 2026. There is no code basis for this limitation and there are cases where this could be significantly larger. Currently is is making th...
about 2 months ago in STAAD Concrete 0 Needs review

Improve calculation of nominal concrete shear of a footing in STAAD Foundation Advanced

This idea is intended to report an issue related to the calculation of nominal concrete shear using STAAD Foundation Advanced V2025. This calculation is performed using ACI 318-19 Equation 22.5.5.1(a), which applies only to non-prestressed members...
4 months ago in STAAD Concrete 1 Planned

Availability of ASCE/SBC Wind Load Generation in STAAD

Dear Bentley Team, Could you please advise when the option to generate wind loads in accordance with ASCE or the Saudi Building Code (SBC) will be available in STAAD? At present, I can only find the wind load generation options for IS 875 (Part 3)...
25 days ago in STAAD.Pro 0 Needs review

Adding measurement tool

The node‑to‑node distance tool in STAAD.Pro is quite basic and, in its current form, not particularly useful when distances need to be measured independently along the X, Y, and Z axes. Bentley already provides this functionality in some of its ot...
8 months ago in STAAD.Pro 8 Needs review

Code check for EN 1993-1-1 is most of cases wrong when a continious member is divided into several part

Ref present Staad versions and beam code check according to Eurocode 1993-1-1 Equation 6.61 and 6.62. Staad divide all beams at every incoming beam location and it is not possible to join together several beams to get correct buckling lengths. Eur...
17 days ago in STAAD.Pro 0 Needs review

Inclusion of the newly released Indian Seismic Code IS 1893 (Part 1&5): 2025 in STAAD.Pro.

Since STAAD.Pro currently supports earlier IS 1893 versions, having the 2025 version integrated will be essential to ensure code-compliant analysis and safe design in India. The 2025 revision introduces major updates: A revised earthquake zone m...
9 months ago in STAAD.Pro 3 Planned

Enhancement Request: Automatic Property Color Assignment

Currently, under the Properties tab, all section properties are displayed in the same color, making it difficult to quickly identify different member types in the model. Previously, a color assignment option existed, but users had to manually assi...
24 days ago in STAAD.Pro 0 Needs review

Provide STAAD Foundation Advanced a method to manage the link to a STAAD.Pro model

When a STAAD Foundation model is created from a STAAD.Pro model, that is added to the STAAD.Pro folder. This process creates pointers in both data sets that link the two models together and allow for notification when changes takes place. However,...
7 months ago in STAAD.Pro 7 Future consideration

Please ADD Tank Foundation Design Module in a future release of STAAD Foundation Advance

Please ADD Tank Foundation Design Module in a future release of STAAD Foundation Advance. This is needed.
14 days ago in STAAD Concrete 0 Needs review

staadpro 中直接分析法,添加屏幕上notional load的显示

在staad 中直接分析法中,用repeat load 然后在用notional load,点击repeat load屏幕上能显示,点击notional load无法显示。能否像repeatload 一样,点击notional load在屏幕上显示notional load。
16 days ago in STAAD.Pro 0 Needs review